Data Centre Decommissioning
Data centre decommissioning for businesses and organisations across the UK, helping you remove redundant servers, storage systems, networking equipment, racks, UPS units, cabling and other technical infrastructure through one coordinated project. We can support infrastructure migrations, consolidation, hardware refreshes and complete technical-site closures, with data handling, asset recovery, reuse and recycling options available depending on the equipment.
Business IT equipment collections throughout the UK.
Licence No. CBDU585219
Secure disposal options for data-bearing IT equipment.
Responsible reuse and recycling routes for redundant business IT.
Redundant Data Centre Infrastructure.
Planned From Rack to Removal.
Data centre decommissioning for businesses and organisations that need servers, racks, storage, networking equipment, UPS units and associated infrastructure removed through one coordinated project.
From smaller technical environments to larger infrastructure estates, we can help plan the decommissioning around equipment volume, site access, data-bearing assets and the appropriate onward route for redundant hardware.
Bigger Infrastructure.
More to Coordinate.
Data centre decommissioning involves more than simply collecting old servers.
A larger technical environment can contain multiple racks, storage arrays, networking infrastructure, UPS equipment, cabling and significant quantities of data-bearing hardware. These elements need to be considered as one wider project.
DISCUSS YOUR PROJECT →Understand the Estate
Identify the hardware, racks and infrastructure included in the decommissioning.
Coordinate the Removal
Consider access, project phases, equipment volumes and site requirements.
Address Data-Bearing Assets
Servers, drives and storage equipment may require separate data handling.
Reuse, Recover or Recycle
Equipment can move into the appropriate onward route based on condition.
Infrastructure Across
the Entire Technical Environment.
Data centre decommissioning can bring together several categories of redundant infrastructure that would otherwise need to be handled separately.
Servers
Rack-mounted and standalone server hardware from redundant environments.
→Storage Systems
Arrays and other storage hardware containing business data and infrastructure.
Networking Equipment
Switches, routers, firewalls and wider network infrastructure.
→ 04 RACKSServer Racks
Empty or populated racks and cabinets forming the physical infrastructure.
→ 05 POWERUPS Equipment
Redundant UPS units and associated power infrastructure.
→ 06 CABLINGNetwork & Power Cables
Patch leads, power cables and redundant technical cabling.
→ 07 COMPONENTSCircuit Boards
Boards and electronic components removed from redundant IT equipment.
→ 08 MIXED ITOther IT Hardware
Additional redundant technology can be incorporated into the wider project.
→
Large Infrastructure
Needs a Clear Removal Plan.
Equipment volume is only one part of a data centre decommissioning project.
The physical layout, loading access, rack locations, floor levels, equipment types and project timetable can all influence how the removal is coordinated.
From Infrastructure Estate
to Cleared Technical Space.
Identify the Infrastructure
Establish what equipment, racks and related assets form part of the project.
Coordinate Access & Sequence
Plan the removal around site access, equipment location and project phases.
Clear the Infrastructure
Agreed racks, hardware and associated equipment are removed from the site.
Data, Recovery & Recycling
Equipment moves into the appropriate onward route based on project requirements.
The Hardware Is Redundant.
The Data May Not Be.
Data centres can contain substantial quantities of data-bearing equipment across servers, storage systems and individual drives.
Depending on the project, data erasure or physical media destruction can be considered before equipment moves toward reuse, recovery or recycling.
Infrastructure Changes.
Entire Environments Become Redundant.
Data centre decommissioning is usually triggered by a larger change to how an organisation manages its IT infrastructure.
That could involve consolidation, migration, relocation, hardware replacement or the complete shutdown of a technical environment.
Remove redundant hardware following the movement of systems into another environment.
Clear equipment no longer required after infrastructure is reduced or combined.
Remove old servers, storage and network hardware after new infrastructure is introduced.
Clear remaining infrastructure before a technical site or room is vacated.
Empty Racks Still
Take Up the Same Space.
Once the hardware has been removed, redundant racks and cabinets may still need to be cleared from the technical environment.
Server rack removal can be incorporated into the wider decommissioning project where those physical cabinets are no longer required.
SERVER RACK REMOVAL →
Decommissioned
Doesn’t Always Mean End of Life.
Data centre hardware can be retired from one environment while still retaining further use or recovery potential.
Once relevant data requirements have been addressed, suitable servers, networking equipment and other assets can be considered for reuse or recovery before recycling becomes necessary.
IT ASSET RECOVERY & REUSE →
One Server Room
Instead of a Data Centre?
Not every technical clearance needs a full data centre decommissioning project.
If the work is concentrated in one server room or comms environment, our dedicated server room clearance service may be the more appropriate route.
SERVER ROOM CLEARANCE →
Server Room
Clearance
SERVERS
SERVER RACKS
NETWORKING EQUIPMENT
UPS EQUIPMENT
CABLING
DATA-BEARING HARDWARE
Questions About
Data Centre Decommissioning?
Common questions about server infrastructure, racks, data security, equipment removal and asset recovery.
01 What equipment can be included? +
Projects can include servers, storage hardware, networking equipment, server racks, UPS units, cabling and other agreed technical infrastructure.
02 Can data-bearing equipment be handled as part of the project? +
Yes. Data erasure or physical media destruction options can be considered for servers, storage devices and other data-bearing equipment.
03 Can server racks be removed? +
Redundant racks and cabinets can be included where the wider physical infrastructure also needs clearing.
04 Can suitable hardware be recovered or reused? +
Suitable assets may be considered for reuse or recovery after the relevant data requirements have been addressed.
05 Can the project be completed in phases? +
Larger projects can be planned around different areas, hardware groups or project stages depending on the site and requirements.
06 What if we only have one server room? +
A smaller technical environment may be better suited to our dedicated server room clearance service.
Plan the Shutdown.
Clear the Hardware.
Tell us what infrastructure is involved, how much equipment needs removing and what the site access is like. We can help plan the project around servers, racks, networking, storage, data and the appropriate onward route.
